Multi-Family & HOA Roofing in Canton, GA

Re-roofing an HOA or an apartment community is a logistics problem before it is a roofing problem: phasing, resident notice, parking, dumpster placement, and a board that needs the same numbers three times. We run these in phases with a single point of contact and a written schedule the board can circulate.

Several similar low-rise residential buildings with one roof under replacement.

Filing on this? What we do and do not do in an insurance claim — including the one thing Georgia law does not allow anybody to offer you.

What we actually do on this job

How it goes

  1. 01

    Survey every building

    Not a sample. Boards get sold sampled surveys and then get a change order in phase three. Every roof gets walked and photographed and the report says which ones can wait.

  2. 02

    Phase it around the community, not around us

    Which buildings, in what order, over what months, and what that does to parking. This is the part that determines whether the board hears about you at the next meeting.

  3. 03

    Build, close out, hand over the file

    Per-building sign-off, photographs, permits and warranty documentation delivered as a set rather than as an afterthought.

The board has three bids and they are not comparable

That is normal and it is usually not anybody's fault: one bid is a per-square number, one is a per-building number with different assumptions about decking, and one has quietly excluded the low-slope sections over the breezeways. We will put ours on the same basis as whichever competing bid the board wants to compare against, line item by line item, and we will point out where the other two have excluded something rather than pretend not to have noticed. A board that cannot compare bids picks the lowest number, and the lowest number is usually the one with the most excluded.

Questions about multi-family & hoa roofing

  • How long does a community take?
    It depends entirely on building count and phasing, and the honest answer is that the schedule is negotiated rather than quoted. What we will commit to is a written phase plan with dates before anything starts, and notice to residents ahead of each phase.
  • What changes the price?
    Building count and roof area, obviously, but also access and staging — a community where the trucks can get to every building is materially cheaper than one where half the buildings are behind a gate and a narrow drive. Phasing over multiple budget years costs more in mobilization and we will tell you how much.
  • How do you handle resident notice and parking?
    We write the notice letters and management sends them, and the phase plan includes which spaces we need and when. Parking is the single most common source of complaint on these jobs, so it goes on paper first.
  • Who pulls the permits?
    We do, per building or per phase as the jurisdiction requires. Our permit technician handles the difference between how each county here wants a multi-building submission packaged, which is not trivial and is worth days.

Free inspection

Request an inspection window

Three steps — four if there has been a storm. About ninety seconds.

  1. Why you're calling
  2. When
  3. You
Why you are calling, and what kind of roof it is
What brings you to us?
Roughly how old is the roof?
How many stories?
A long run of finished architectural shingle roofline against a clearing storm sky.