Skip to content
LockridgeRoofing & Exteriors

Roof Replacement in Cartersville, GA

Cartersville has the oldest housing stock we work in, which makes a tear-off here a genuinely different job from one in Cherokee County. What is under the shingles is the variable.

On stock this old, the tear-off is where the job actually gets decided

A third of Cartersville's housing was built in 1979 or earlier and the Granger Hill Historic District covers two subdivisions platted in the 1930s and developed through the 1950s. On a house from that era the shingles are the least interesting part of the assembly. We expect plank decking rather than sheathing panels, and planks with gaps wide enough that a standard fastener schedule does not land where it should. We expect at least one previous layer that may have been covered rather than removed. We expect chimney flashing that was mortared into a joint instead of stepped and counter-flashed, which works until the mortar lets go. None of that is unusual and none of it is a crisis — but it is why the estimate on a house like this has a decking allowance with a stated per-sheet rate on it, and why we photograph the deck the moment it is exposed and show you before anything goes back down. Worth knowing the code position too: Georgia deletes Chapter 1 of the residential code — the permit chapter — without substitution, so whether you pull one is the City of Cartersville Building Department's call, but Georgia amends nothing at all in Chapter 9, the roof-assemblies chapter, so the technical requirements for the reroof itself apply here exactly as written.

We are not going to tell you how long a roof lasts

You will find a confident number on almost every roofing site in this country — twenty years, twenty-five, thirty. We went looking for an authoritative published service life for asphalt shingles and could not find one we would stand behind, so we are not going to repeat somebody else's. What decides whether your roof needs replacing is its condition, not its birthday: whether the tabs are still sealed, whether the mat is showing, what the penetrations and the flashing look like, and what is under the decking. All of that is visible in forty-five minutes and none of it is guessable from the street.

What this covers

Each of these is a service in its own right, offered in Cartersville and everywhere else we work.

Everything we do in Cartersville

Common questions

  • How long does a roof replacement take?
    Most residential replacements are one day. Complicated geometry, a steep pitch, or a lot of decking replacement can make it two. We tell you which one yours is before we start, not at four in the afternoon on day one.
  • What actually changes the price?
    Squares — the measured area — then pitch, the number of penetrations and valleys, how many layers have to come off, the decking we find underneath, and the system you choose. Access matters too: a house you can back a dump trailer up to is cheaper to strip than one on a long, tight drive.
  • Layover or tear-off?
    Tear-off, on our jobs. A layover covers the deck, which means nobody inspects the thing most likely to be the actual problem, and it makes the next replacement a two-layer strip. It is cheaper today and more expensive over the life of the house.

Free inspection

Request an inspection window

Three steps — four if there has been a storm. About ninety seconds.

  1. Why you're calling
  2. When
  3. You
Why you are calling, and what kind of roof it is
What brings you to us?
Roughly how old is the roof?
How many stories?
A long run of finished architectural shingle roofline against a clearing storm sky.

Get on the roof and know for sure.

Forty-five minutes, dated photographs, a written answer, and no obligation of any kind.

CallFree inspection